Home > Blog > GiveBig Trail Target #3: No. 2 Canyon
GiveBig Trail Target #3: No. 2 Canyon

GiveBig Trail Target #3: No. 2 Canyon

01 | May | '18
Ian Terry

 

Trail: No. 2 Canyon - Wenatchee, Washington (Central Chapter)

Project Goal: 8 new trail miles at No. 2 Canyon near Wenatchee, connecting the town to Mission Ridge.

Funds needed: $5,000

 

 

Support New Trails at No. 2 Canyon Now!

GiveBig ProjectMap2Canyon

Evergreen perspective:

"No. 2 Canyon is Wenatchee’s 30 mile trail system. It's a critical piece of the puzzle connecting trail systems together. Riding from town to No. 2 Canyon and connecting the Horse Lake trails would make for 50 miles of uninterrupted singletrack. It’s going to have something for the entire family. We’ll have a gazebo and a skills park with everything from beginner trails to advanced black diamond directional trails. It’s truly a comprehensive trail plan." – Travis Hornby, Evergreen Central Chapter President

 

Local rider perspective:

"No. 2 Canyon is a unique place for us in the valley. The terrain there is a bit higher up and enters into a whole new type of topography. It brings you up out of the desert and into land with more dispersed trees. When you go up there, you see these amazing rock lines that are just begging for trails to connect them. There are all kinds of lines you want to ride, but there isn’t much flow the way it is now. This new project would connect everything and make for an incredible riding experience." – Craig Vander Hart, local rider and philosophy professor at Wenatchee Valley College

 

Donate Now and #BeTheBuilder at No. 2 Canyon!

GiveBig Trail Target #3: No. 2 Canyon
3754