BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//jEvents 2.0 for Joomla//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:STANDARD
DTSTART:20251102T010000
RDATE:20260308T030000
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:America/Los_Angeles PST
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:20250605T130000
RDATE:20251102T010000
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:America/Los_Angeles PDT
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
UID:f0016bd0c2c41a53fddddeab1aea4752
CATEGORIES:Work Parties
CREATED:20260515T084412
SUMMARY:Teanaway Trailhead & Trail System Grand Opening with DNR
LOCATION:Lower West Fork Teanaway
URL;VALUE=URI:https://www.evergreenmtb.org/calendar/eventdetail/25574/teanaway-trailhead-
 trail-system-grand-opening-with-dnr?tmpl=component
DESCRIPTION:Click the following link for the latest event details: https://www.evergree
 nmtb.org/calendar/eventdetail/25574/teanaway-trailhead-trail-system-grand-o
 pening-with-dnr\n\nJoin Evergreen Mountain Bike Alliance and the Washington
  State Department of Natural Resources for the Grand Opening of the Teanawa
 y Trail System in the Teanaway Community Forest.\n
This project has been in
  the works since 2014 when Washington State acquired the land that is now t
 he Teanaway Community Forest. Evergreen has been involved with the creation
  of the Management Plan, the Recreation Plan, and since 2020 a Member of th
 e West Fork Trail Coalition (along with WTA, Mountains to Sound Greenway an
 d Backcountry Horsemen of Washington) working with DNR to create and implem
 ent a phased trail plan that envisions a 55 mile multi-use trail system in 
 the Teanaway.\n
In Phase 1 starting in 2022, coalition members created the 
 Upper BST Trail (Evergreen Kittitas Chapter), a new climbing trail for Lowe
 r BST (Evergreen Kittitas Chapter), the Frog Pond loop (WTA) and the Cheese
  Rock Trail (Mountains to Sound). DNR has built a new parking area with res
 trooms, installed a bike repair station and kiosks and signs with trail inf
 ormation. All the Phase 1 trails are now signed.\n
Phase 2 is underway with
  our Evergreen Kittitas Chapter building the Windy Ridge trail (with help f
 rom other Coalition Partners) and WTA/MTSG working on the Aspen Grove loop.
 \n
We hope you can join us to celebrate this milestone that we have all wor
 ked so hard to achieve!\n
What: Grand Opening of the new Teanaway Trailhead
  and trail system. Ceremony followed by guided hikes and rides.\n
When: 1pm
  on June 6, 2026\n
Where: West Fork Teanaway Trailhead: https://maps.app.go
 o.gl/HqqWT1f2h8dPJy9R6\n
Who: All are welcome to join Evergreen Mountain Bi
 ke Alliance, the West Fork Trail Coalition partners, Washington State Depar
 tment of Natural Resources, and community partners in celebration.\n
The ev
 ent will include a short ceremony at the trailhead followed by guided hikes
  and rides on the new trails. This project was made possible through a long
 -term partnership between Evergreen Mountain Bike Alliance and Washington S
 tate Department of Natural Resources, supported by community fundraising, g
 rants, and volunteer efforts. All are welcome!\n
X-ALT-DESC;FMTTYPE=text/html:Click the following link for the latest event details: https://www.evergree
 nmtb.org/calendar/eventdetail/25574/teanaway-trailhead-trail-system-grand-o
 pening-with-dnr\n\n<p>Join Evergreen Mountain Bike Alliance and the Washing
 ton State Department of Natural Resources for the Grand Opening of the Tean
 away Trail System in the Teanaway Community Forest.</p><p>This project has 
 been in the works since 2014 when Washington State acquired the land that i
 s now the Teanaway Community Forest. Evergreen has been involved with the c
 reation of the Management Plan, the Recreation Plan, and since 2020 a Membe
 r of the West Fork Trail Coalition (along with WTA, Mountains to Sound Gree
 nway and Backcountry Horsemen of Washington) working with DNR to create and
  implement a phased trail plan that envisions a 55 mile multi-use trail sys
 tem in the Teanaway.</p><p>In Phase 1 starting in 2022, coalition members c
 reated the Upper BST Trail (Evergreen Kittitas Chapter), a new climbing tra
 il for Lower BST (Evergreen Kittitas Chapter), the Frog Pond loop (WTA) and
  the Cheese Rock Trail (Mountains to Sound). DNR has built a new parking ar
 ea with restrooms, installed a bike repair station and kiosks and signs wit
 h trail information. All the Phase 1 trails are now signed.</p><p>Phase 2 i
 s underway with our Evergreen Kittitas Chapter building the Windy Ridge tra
 il (with help from other Coalition Partners) and WTA/MTSG working on the As
 pen Grove loop.</p><p>We hope you can join us to celebrate this milestone t
 hat we have all worked so hard to achieve!</p><p><strong>What:</strong> Gra
 nd Opening of the new Teanaway Trailhead and trail system. Ceremony followe
 d by guided hikes and rides.</p><p><strong>When:</strong> 1pm on June 6, 20
 26</p><p><strong>Where:</strong> West Fork Teanaway Trailhead: <a href="htt
 ps://maps.app.goo.gl/HqqWT1f2h8dPJy9R6">https://maps.app.goo.gl/HqqWT1f2h8d
 PJy9R6</a></p><p><strong>Who:</strong> All are welcome to join Evergreen Mo
 untain Bike Alliance, the West Fork Trail Coalition partners, Washington St
 ate Department of Natural Resources, and community partners in celebration.
 </p><p>The event will include a short ceremony at the trailhead followed by
  guided hikes and rides on the new trails. This project was made possible t
 hrough a long-term partnership between Evergreen Mountain Bike Alliance and
  Washington State Department of Natural Resources, supported by community f
 undraising, grants, and volunteer efforts. All are welcome!</p>
DTSTAMP:20260603T022234
DTSTART;TZID=America/Los_Angeles:20260606T130000
DTEND;TZID=America/Los_Angeles:20260606T150000
SEQUENCE:0
TRANSP:OPAQUE
END:VEVENT
END:VCALENDAR